Kontakt oss

Fem stål (Tianjin) Tech Co., Ltd.

Adresse

Daqiuzhuang Industrial Park,

Jinghai District , Tianjin by, Kina

E-post

henvendelse @ fivesteeltech.com

 

telefon

0086 22 5938 5986

timer

Mandag-fredag: 9am til 18:00

Lørdag: kl 10 til 14:00

Søndag: Stengt

Ønsker å jobbe med oss?


Inquiry For Prisliste

For henvendelser om våre produkter eller prisliste, kan du legge inn e-post til oss, og vi tar kontakt innen 24 timer.

Kontakt oss

  • Fem stål (Tianjin) Tech Co., Ltd.
  • Telefon: 0086 22 5938 5986
  • E-post: [email protected]
  • Fax: 0086 22 5938 5987
  • Whatsapp: 008618202256900

siste nytt

  • Cement fibreboard curtain wall

    Cement fibreboard curtain wall

    The application height of cement fibreboard curtain wall should not be more than 100m, and the area of a single plate should not be more than 1.5m2. Design life should not be less than 25 years. When the application h...

  • Sustainable Features of Aluminium Curtain Wall

    Sustainable Features of Aluminium Curtain...

    Sustainability in architecture means buildings which combine comfort for the user while respecting the environment and minimum energy usage. Energy performance, user comfort, building functionality and cost over the l...

  • Natural Forces And Their Effects on Curtain Wall System

    Natural Forces And Their Effects on Curta...

    Obviously all exterior walls, of whatever material, are subject to, and must withstand the ravaging effects of the nature. Curtain wall systems are the most abused of building elements being subjected to wind loading,...

  • More details about stick curtain wall

    More details about stick curtain wall

    As a rule, stick curtain wall systems comprise individual vertical and horizontal spanning members (’stick’) known as mullions and transoms respectively. A typical curtain wall system will be connected to individual f...

  • Modern curtain wall design provides fire protection for high-rise buildings

    Modern curtain wall design provides fire ...

    In building construction process, the designers carry out different designs according to the different fire protection requirements of the building. For curtain wall buildings with general fire protection requirements...